# AeThex LIVE - Phase Execution Guide
|
|
|
|
**Last Updated**: February 7, 2025
|
|
**Status**: Phase 1 In Progress
|
|
|
|
---
|
|
|
|
## Quick Navigation
|
|
|
|
| Phase | Status | Timeline | Link |
|
|
|-------|--------|----------|------|
|
|
| **1** | 🔄 IN PROGRESS | Weeks 1-4 | [PHASE_1_FOUNDATION.md](PHASE_1_FOUNDATION.md) |
|
|
| **2** | ⏳ UPCOMING | Weeks 5-8 | [PHASE_2_SOCIAL_DISCOVERY.md](PHASE_2_SOCIAL_DISCOVERY.md) |
|
|
| **3** | ⏳ FUTURE | Weeks 9-13 | [PHASE_3_CREATOR_TOOLS.md](PHASE_3_CREATOR_TOOLS.md) |
|
|
| **4** | ⏳ FUTURE | Weeks 14-19 | [PHASE_4_MONETIZATION.md](PHASE_4_MONETIZATION.md) |
|
|
| **5** | ⏳ FUTURE | Weeks 20-23 | [PHASE_5_COMMUNITY.md](PHASE_5_COMMUNITY.md) |
|
|
| **6** | ⏳ FUTURE | Weeks 24-29 | [PHASE_6_GAMING.md](PHASE_6_GAMING.md) |
|
|
| **7** | ⏳ FUTURE | Weeks 30-33 | [PHASE_7_MUSIC.md](PHASE_7_MUSIC.md) |
|
|
| **8** | ⏳ FUTURE | Weeks 34-37 | [PHASE_8_ENTERPRISE.md](PHASE_8_ENTERPRISE.md) |
|
|
| **9** | ⏳ FUTURE | Week 38+ | [PHASE_9_SCALE.md](PHASE_9_SCALE.md) |
|
|
|
|
**Full Overview**: [PHASES_OVERVIEW.md](PHASES_OVERVIEW.md)
|
|
|
|
---
|
|
|
|
## Current Status - Phase 1
|
|
|
|
**Completion**: ~50% (estimated mid-February 2025)
|
|
|
|
### ✅ Completed
|
|
- [x] HLS player with auto-recovery
|
|
- [x] Stream hosting infrastructure (Cloudflare/Mux ready)
|
|
- [x] Project structure & dependencies
|
|
|
|
### 🔄 In Progress
|
|
- [ ] Database setup (PostgreSQL on Railway)
|
|
- [ ] Clerk authentication integration
|
|
- [ ] Real-time chat with Socket.io
|
|
- [ ] Creator profiles and onboarding
|
|
|
|
### ⏳ Not Started
|
|
- [ ] Stream key management UI
|
|
- [ ] Go live / end stream buttons
|
|
- [ ] Viewer count tracking
|
|
- [ ] Chat persistence
|
|
|
|
### 📊 Phase 1 Goals vs Progress
|
|
```
|
|
Database setup ████░░░░░░ 40%
|
|
Authentication ███░░░░░░░ 30%
|
|
Chat backend ██░░░░░░░░ 20%
|
|
Stream management ░░░░░░░░░░ 0%
|
|
Overall Phase 1 ███░░░░░░░ 30%
|
|
```
|
|
|
|
---
|
|
|
|
## Week-by-Week Plan
|
|
|
|
### This Week (Feb 3-9)
|
|
**Focus**: Database & Auth Foundation
|
|
|
|
**Tasks**:
|
|
- [ ] Finalize PostgreSQL on Railway
|
|
- [ ] Run all Prisma migrations
|
|
- [ ] Complete Clerk integration
|
|
- [ ] User profile creation working
|
|
|
|
**Deliverable**: Users can sign up and create profiles
|
|
|
|
**Team Assignments**:
|
|
- Database design: Senior dev (1x)
|
|
- Authentication: Mid-level dev (1x)
|
|
|
|
---
|
|
|
|
### Next Week (Feb 10-16)
|
|
**Focus**: Streaming & VOD Capture
|
|
|
|
**Tasks**:
|
|
- [ ] Cloudflare Stream setup complete
|
|
- [ ] Stream key generation & display
|
|
- [ ] Go live / end stream buttons
|
|
- [ ] HLS playback on viewer page
|
|
- [ ] Recording capture enabled
|
|
|
|
**Deliverable**: Creator can go live, viewers can watch
|
|
|
|
**Team Assignments**:
|
|
- Streaming setup: Platform engineer (1x)
|
|
- Streaming UI: Frontend dev (1x)
|
|
|
|
---
|
|
|
|
### Week 3 (Feb 17-23)
|
|
**Focus**: Real-time Chat
|
|
|
|
**Tasks**:
|
|
- [ ] Socket.io server setup
|
|
- [ ] Chat message persistence
|
|
- [ ] Chat UI component
|
|
- [ ] Real-time message delivery
|
|
- [ ] Message deletion (moderation)
|
|
|
|
**Deliverable**: Full chat experience with history
|
|
|
|
**Team Assignments**:
|
|
- Socket.io backend: Backend dev (1x)
|
|
- Chat frontend: Frontend dev (1x)
|
|
|
|
---
|
|
|
|
### Week 4 (Feb 24-Mar 2)
|
|
**Focus**: Integration & Launch
|
|
|
|
**Tasks**:
|
|
- [ ] Full stream page integration
|
|
- [ ] Mobile responsiveness
|
|
- [ ] Testing & bug fixes
|
|
- [ ] Production deployment
|
|
- [ ] Monitoring setup
|
|
|
|
**Deliverable**: Phase 1 launched, beta crew onboarded
|
|
|
|
**Team Assignments**:
|
|
- Integration: 2x full-stack devs
|
|
- Testing: QA lead (1x)
|
|
- DevOps: Infrastructure engineer (0.5x)
|
|
|
|
---
|
|
|
|
## Key Metrics to Track
|
|
|
|
### Usage Metrics
|
|
```
|
|
Weekly Tracking Sheet:
|
|
├── Creators Signed Up
|
|
├── Total Users
|
|
├── Peak Concurrent Viewers
|
|
├── Streams per Day
|
|
├── Chat Messages per Stream
|
|
└── Average Session Duration
|
|
```
|
|
|
|
### Technical Metrics
|
|
```
|
|
├── API Latency (p50, p99)
|
|
├── Chat Message Latency
|
|
├── HLS Player Error Rate
|
|
├── Database Query Performance
|
|
├── Server CPU/Memory Usage
|
|
└── Uptime %
|
|
```
|
|
|
|
### Business Metrics
|
|
```
|
|
├── Cost per user
|
|
├── Infrastructure costs
|
|
├── Support tickets
|
|
├── User feedback scores
|
|
└── Feature requests
|
|
```
|
|
|
|
---
|
|
|
|
## Resource Requirements
|
|
|
|
### Team
|
|
```
|
|
Phase 1: 3 devs minimum
|
|
├── Backend/Database specialist (1)
|
|
├── Frontend specialist (1)
|
|
└── Full-stack / Infrastructure (1)
|
|
|
|
Additional as needed:
|
|
├── QA engineer (0.5)
|
|
├── DevOps engineer (0.5)
|
|
└── Product manager (0.5)
|
|
```
|
|
|
|
### Infrastructure
|
|
```
|
|
Monthly Costs (Phase 1):
|
|
├── Railway (Database): $50-100
|
|
├── Vercel (Hosting): $20-40
|
|
├── Cloudflare (CDN/Stream): $200-500
|
|
├── Clerk (Auth): $0-25
|
|
├── Monitoring (Sentry, etc): $50-100
|
|
└── Misc (email, etc): $20-50
|
|
───────────────────────────────────
|
|
Total: ~$400-800/month
|
|
```
|
|
|
|
### Tools & Services Checklist
|
|
```
|
|
☐ Railway.app (Database)
|
|
- PostgreSQL instance
|
|
- Connection pooling enabled
|
|
|
|
☐ Clerk (Auth)
|
|
- Production keys configured
|
|
- Webhook setup
|
|
|
|
☐ Cloudflare Stream or Mux (Video)
|
|
- Account created
|
|
- RTMP ingest URL
|
|
- API keys obtained
|
|
|
|
☐ Cloudflare R2 (Storage)
|
|
- Bucket created
|
|
- Policy configured
|
|
|
|
☐ Vercel (Hosting)
|
|
- Project connected
|
|
- Environment variables set
|
|
|
|
☐ Monitoring
|
|
- Sentry for errors
|
|
- PostHog for analytics
|
|
- Uptime.com for monitoring
|
|
```
|
|
|
|
---
|
|
|
|
## Development Workflow
|
|
|
|
### Daily Standup Template
|
|
```
|
|
Each dev answers:
|
|
1. What did I complete yesterday?
|
|
2. What am I working on today?
|
|
3. What blockers do I have?
|
|
|
|
Keep to 15 minutes max
|
|
Escalate blockers immediately
|
|
```
|
|
|
|
### Git Workflow
|
|
```
|
|
Main branches:
|
|
- main (production)
|
|
- develop (staging)
|
|
- feature/* (feature branches)
|
|
|
|
Process:
|
|
1. Create feature branch: git checkout -b feature/auth-setup
|
|
2. Regular commits: git commit -m "Clear, descriptive message"
|
|
3. Push to remote: git push origin feature/auth-setup
|
|
4. Create PR with description
|
|
5. Code review by 1+ devs
|
|
6. Merge when approved + tests pass
|
|
```
|
|
|
|
### Definition of Done (for each Sprint)
|
|
```
|
|
Code:
|
|
☐ Feature implemented per spec
|
|
☐ Tests written (unit + integration)
|
|
☐ Code reviewed and approved
|
|
☐ No linting errors
|
|
☐ Merged to develop branch
|
|
|
|
Documentation:
|
|
☐ Code commented where needed
|
|
☐ README updated
|
|
☐ API docs updated
|
|
☐ Database schema documented
|
|
|
|
Testing:
|
|
☐ Manual testing on localhost
|
|
☐ Mobile browser testing
|
|
☐ Cross-browser testing
|
|
☐ No console errors
|
|
|
|
Deployment:
|
|
☐ Merged to main
|
|
☐ .env variables set on Vercel
|
|
☐ Migrations ran successfully
|
|
☐ Feature visible in production
|
|
☐ Monitored for 2 hours post-launch
|
|
```
|
|
|
|
---
|
|
|
|
## Sprint Planning Process
|
|
|
|
### Before Each Sprint (Sunday)
|
|
1. Review previous sprint velocity
|
|
2. Estimate new work in story points
|
|
3. Assign tasks to team members
|
|
4. Create GitHub issues for each task
|
|
5. Set success criteria for sprint
|
|
|
|
### During Sprint (Mon-Fri)
|
|
- Daily standups (9am, 15 min)
|
|
- Continuous deployment (auto-deploy to staging)
|
|
- PR reviews within 24 hours
|
|
- Blocker resolution same-day
|
|
|
|
### End of Sprint (Friday)
|
|
- Demo to stakeholders
|
|
- Retrospective (what went well, what to improve)
|
|
- Begin next sprint planning
|
|
|
|
---
|
|
|
|
## Quality Assurance Plan
|
|
|
|
### Testing Levels
|
|
```
|
|
Unit Tests
|
|
├── API route tests
|
|
├── Database queries
|
|
├── Utility functions
|
|
├── Target: 80%+ coverage
|
|
|
|
Integration Tests
|
|
├── Auth flow end-to-end
|
|
├── Chat message flow
|
|
├── Stream creation to viewing
|
|
├── Target: All critical paths
|
|
|
|
E2E Tests (Playwright)
|
|
├── Sign up → Create channel → Go live
|
|
├── Viewer: Discover → Watch → Chat
|
|
├── Full user journeys
|
|
├── Target: 10+ key user flows
|
|
|
|
Performance Tests
|
|
├── Stream player at 10k concurrent viewers
|
|
├── Chat at 1000 msg/sec
|
|
├── API at 1000 req/sec
|
|
├── Target: No errors, <2s latency
|
|
```
|
|
|
|
### Browser & Device Testing
|
|
```
|
|
🖥️ Desktop:
|
|
☐ Chrome (latest)
|
|
☐ Firefox (latest)
|
|
☐ Safari (latest)
|
|
☐ Edge (latest)
|
|
|
|
📱 Mobile:
|
|
☐ iPhone 12/14/15 (iOS 16+)
|
|
☐ Samsung Galaxy S22/S23 (Android 12+)
|
|
☐ iPad / Tablet (landscape & portrait)
|
|
|
|
Network:
|
|
☐ Broadband (25 Mbps+)
|
|
☐ 4G LTE simulation
|
|
☐ Slow 3G simulation
|
|
```
|
|
|
|
---
|
|
|
|
## Launch Checklist
|
|
|
|
### Code Ready
|
|
- [ ] All features implemented per spec
|
|
- [ ] Zero critical bugs
|
|
- [ ] 90%+ test coverage
|
|
- [ ] Lighthouse > 90 on mobile
|
|
- [ ] No console errors/warnings
|
|
|
|
### Infrastructure Ready
|
|
- [ ] Database backups configured
|
|
- [ ] Monitoring alerts set up
|
|
- [ ] Error tracking (Sentry) working
|
|
- [ ] Analytics (PostHog) configured
|
|
- [ ] CDN cache rules optimized
|
|
|
|
### Security Ready
|
|
- [ ] SSL certificate installed
|
|
- [ ] CORS configured correctly
|
|
- [ ] Rate limiting enabled
|
|
- [ ] Input validation on all endpoints
|
|
- [ ] Secrets not in code (all in .env)
|
|
|
|
### Documentation Ready
|
|
- [ ] README updated
|
|
- [ ] API documentation complete
|
|
- [ ] Database schema documented
|
|
- [ ] Deployment guide written
|
|
- [ ] Troubleshooting guide created
|
|
|
|
### User Ready
|
|
- [ ] Onboarding flow smooth (< 2 min signup)
|
|
- [ ] Creator guide written
|
|
- [ ] FAQ created for common issues
|
|
- [ ] Support email set up
|
|
- [ ] Community Discord created
|
|
|
|
### Marketing Ready
|
|
- [ ] Landing page deployed
|
|
- [ ] Twitter account ready
|
|
- [ ] Launch announcement drafted
|
|
- [ ] Influencer outreach list
|
|
- [ ] Press kit prepared
|
|
|
|
---
|
|
|
|
## Post-Launch Monitoring (First 24h)
|
|
|
|
### Critical Metrics
|
|
```
|
|
Every 5 minutes:
|
|
- API error rate (should be <0.1%)
|
|
- Stream latency (should be <2s)
|
|
- Chat message delivery time (<100ms)
|
|
|
|
Every 30 minutes:
|
|
- Database connections
|
|
- Memory usage
|
|
- Disk usage
|
|
|
|
Email alerts if:
|
|
- Error rate > 1%
|
|
- Latency > 5s
|
|
- Errors spike (>10 per minute)
|
|
- 500 errors appear
|
|
```
|
|
|
|
### Team Rotation
|
|
```
|
|
24/7 coverage needed:
|
|
- On-call engineer (CTO or senior)
|
|
- Slack notifications enabled
|
|
- 15-minute incident response time
|
|
- Daily standup to catch issues early
|
|
```
|
|
|
|
---
|
|
|
|
## Feedback & Iteration
|
|
|
|
### Weekly Creator Feedback
|
|
```
|
|
Reach out to 5-10 beta creators:
|
|
1. What's working great?
|
|
2. What's frustrating?
|
|
3. What's missing?
|
|
4. Would they use it for real?
|
|
|
|
Document in: feedback_v1.txt
|
|
Prioritize fixes
|
|
```
|
|
|
|
### Analytics Monitoring
|
|
```
|
|
Weekly report (Fridays):
|
|
- New signups
|
|
- DAU/MAU
|
|
- Retention rate
|
|
- Feature adoption
|
|
- Issues/bugs reported
|
|
|
|
Decide: What to fix vs what's working
|
|
```
|
|
|
|
### Roadmap Adjustments
|
|
```
|
|
After week 2, reassess:
|
|
- Are we on timeline?
|
|
- Is the feature mix right?
|
|
- Should we pivot anything?
|
|
- What should Phase 2 focus on?
|
|
|
|
Adjust plan monthly
|
|
```
|
|
|
|
---
|
|
|
|
## Transition to Phase 2
|
|
|
|
### Prerequisite: Phase 1 Complete
|
|
✅ 100+ creators signed up
|
|
✅ Stable streaming working
|
|
✅ Chat functional
|
|
✅ <2% error rate
|
|
|
|
### Phase 2 Kickoff Meeting
|
|
```
|
|
Monday, Week 5 (approx March 3, 2025)
|
|
|
|
Attendees:
|
|
- Product lead
|
|
- Engineering leads
|
|
- Design lead
|
|
|
|
Topics:
|
|
1. Phase 1 retrospective (what to improve)
|
|
2. Phase 2 overview (social & discovery)
|
|
3. Resource allocation
|
|
4. Sprint planning for Phase 2
|
|
5. Onboarding 250+ new creators goal
|
|
```
|
|
|
|
---
|
|
|
|
## Long-Term Success Factors
|
|
|
|
### Technical Excellence
|
|
```
|
|
✅ Uptime > 99.9%
|
|
✅ Latency < 100ms p99
|
|
✅ Auto-scaling infrastructure
|
|
✅ Disaster recovery plan
|
|
✅ Regular security audits
|
|
```
|
|
|
|
### Creator Satisfaction
|
|
```
|
|
✅ Creators earn more than alternatives
|
|
✅ Easy-to-use tools
|
|
✅ Quick support response (<2h)
|
|
✅ Regular feature updates
|
|
✅ Creator community & events
|
|
```
|
|
|
|
### Viewer Engagement
|
|
```
|
|
✅ Discover new content easily
|
|
✅ Fast, smooth playback
|
|
✅ Interactive features (chat, reactions)
|
|
✅ Following notifications
|
|
✅ Personalized recommendations
|
|
```
|
|
|
|
### Business Health
|
|
```
|
|
✅ Positive unit economics
|
|
✅ <30 month payback period
|
|
✅ Healthy creator base (not dependent on 1-2)
|
|
✅ Growing ARPU (revenue per user)
|
|
✅ Sustainable margins (>30%)
|
|
```
|
|
|
|
---
|
|
|
|
## Conclusion
|
|
|
|
**AeThex LIVE** is on a 9-phase journey to become the world's best creator platform.
|
|
|
|
**Phase 1** (current) establishes the foundation. Phases 2-8 add features that creators and viewers love. Phase 9 is the endless pursuit of excellence.
|
|
|
|
**Success depends on**:
|
|
1. ✅ Executing phases on-time
|
|
2. ✅ Listening to creator feedback
|
|
3. ✅ Maintaining quality & reliability
|
|
4. ✅ Growing community organically
|
|
5. ✅ Moving fast but sustainable
|
|
|
|
**Next step**: Use [PHASE_1_FOUNDATION.md](PHASE_1_FOUNDATION.md) as your day-to-day guide for the next 4 weeks.
|
|
|
|
---
|
|
|
|
**Questions?** Refer to:
|
|
- Architecture decisions: [PLATFORM_ARCHITECTURE.md](PLATFORM_ARCHITECTURE.md)
|
|
- Database schema: [DATABASE_SCHEMA.md](DATABASE_SCHEMA.md)
|
|
- API structure: [API_STRUCTURE.md](API_STRUCTURE.md)
|
|
- Overall vision: [PHASES_OVERVIEW.md](PHASES_OVERVIEW.md)
|
|
|
|
---
|
|
|
|
**Let's build the future of creator streaming! 🚀**
|
|
|
|
*Last Updated: February 7, 2025*
|
|
*Next Update: February 14, 2025 (weekly)*
|